GreenlightUPS installs and load tests new and refurbished UPS systems for data centers, server rooms, healthcare sites, and industrial facilities, including UPS systems of any brand bought from other suppliers. A correct installation is the first step to a UPS that actually carries load during an outage.
Installations are done nationwide by GreenlightUPS's own technicians, and every job is quoted before work is scheduled.
What is included in a UPS installation?
A typical GreenlightUPS installation covers:
- Site review. Confirm available space, floor loading, rack depth, clearances, ventilation, and the input power available at the location.
- Electrical requirements. Confirm input voltage, phase, breaker size, and plug or hardwire type (for example NEMA L6-30P or hardwired).
- Delivery and placement. Coordinate freight, move the unit into place, and rack-mount or position tower and cabinet systems.
- Battery installation. Install and connect internal battery modules and any extended-run battery cabinets.
- Connection. Connect output to loads, PDUs, or panels. Hardwired electrical hookup is done by your electrician, or GreenlightUPS can bring an electrician on-site.
- Configuration. Power up, verify firmware, set output voltage, alarms, and runtime thresholds, and configure the network management card for remote monitoring if one is fitted (cards are an add-on).
- Load and transfer test. Verify the UPS carries the connected load and transfers to battery correctly.
- Handover. Walk your team through alarms, bypass operation, and shutdown. A written service report is available on request, usually as a PDF.
Which UPS systems does GreenlightUPS install?
We install systems sold in our catalog, including rack-mount and tower units from our Server UPS category, modular systems such as APC Symmetra PX and Symmetra LX, and three-phase systems from our Enterprise UPS category.
We install all UPS brands, including systems purchased elsewhere. There is no size limit on installation, and we do a lot of three-phase installation and service.
Three-phase and data center UPS installation
We do a lot of three-phase work, with no size limit: modular systems such as APC Symmetra PX, including the 250–500kVA frames with 25kVA modules, Galaxy, Eaton and Liebert three-phase UPS, plus their external battery cabinets and maintenance bypass. A three-phase job covers delivery to the room (not just the dock), placement and anchoring, battery cabinet assembly, coordination with your electrician on the panel and bypass, and a load and transfer test before handover. See three-phase UPS service.
Replacing an old UPS
Replacing an aging, failed or discontinued UPS, such as an APC Symmetra LX or Smart-UPS VT? We size the replacement for your current load, supply it New (including New Open Box) or Refurbished, and install it nationwide with our own technicians. On replacement installs, we remove the old UPS and haul it away for you. Where the site allows, the removal, installation and load test happen in the same visit. On-site startup is available as a paid add-on. Plan the size first with our UPS sizing guide, or call 954-366-3070. If you'd rather keep an LX running, see our Symmetra LX revitalization package.
What affects the installation quote
UPS size and phase, hardwired vs. plug-in, extended-run cabinets, access (dock, elevator, stairs, door widths), and after-hours work. Other plugs can be fitted as an option. On-site startup is a separately priced add-on to a UPS purchase. Every job is quoted, and you approve the quote before work starts.
Why does a documented startup matter?
A documented startup records baseline readings, settings, and test results that make future maintenance and troubleshooting faster. If your UPS manufacturer's warranty has startup requirements, check them before installation so the work can be planned to match.
How do I prepare for a UPS installation?
Have this information ready when you call:
- UPS make and model, or the load you need to protect
- Site address and the room where the UPS will go
- Input power available (voltage, phase, breaker, receptacle)
- Access details: loading dock, elevator, stairs, door widths
- Preferred installation window, including any after-hours requirement
Where does GreenlightUPS install?
GreenlightUPS installs UPS systems nationwide, and statewide across all of Florida, using its own technicians. Depending on the site, most installations take from about an hour to a few hours, and a large job can take a full day. Every installation is quoted and scheduled with you. If an existing UPS has already failed, see emergency UPS repair.
FAQ
Does GreenlightUPS install UPS systems?
Yes. GreenlightUPS provides UPS installation nationwide, done by its own technicians. On-site startup is available as a separately priced add-on.
Does GreenlightUPS install a UPS I bought somewhere else?
Yes. GreenlightUPS installs all UPS brands, including systems bought from other suppliers, as well as systems from its own catalog.
Do you remove the old UPS when you install a replacement?
Yes. On replacement installs, GreenlightUPS removes the old UPS and hauls it away.
Does GreenlightUPS install refurbished UPS systems?
Yes. GreenlightUPS installs both new and refurbished UPS systems from its catalog, and on-site startup is available for either as a separately priced add-on.
How long does a UPS installation take?
It depends on the site. Most installations take from about an hour to a few hours; a big job can take a full day.
Is there a size limit on UPS installation?
No. GreenlightUPS installs UPS systems of any size and does a lot of three-phase installation.
Do I need an electrician for a UPS installation?
Hardwired and three-phase UPS systems require electrical work at the panel. Your electrician can make the hookup, or GreenlightUPS can bring an electrician on-site.
Do you offer UPS installation services outside Florida?
Yes. GreenlightUPS installs UPS systems nationwide with its own technicians, and statewide across all of Florida.